PENGUMUMAN PEMENANG E-PELELANGAN UMUM PASCAKUALIFIKASI NO : HM.104/07/631/ULP-WIL.VI.PLK.18 TANGGAL 27 MARET 2018 PEK PEMENUHAN STANDAR RUNWAY STRIP EKSISTING (STRIPPING DAN TIMBUNAN) LUAS 84.000 M2
POKJA UPBU KUALA PEMBUANG
TERLAMPIR
PENGUMUMAN PEMENANG E-PELELANGAN UMUM PASCAKUALIFIKASI NO : HM.104/07/631/ULP-WIL.VI.PLK.18 TANGGAL 27 MARET 2018 PEK PEMENUHAN STANDAR RUNWAY STRIP EKSISTING (STRIPPING DAN TIMBUNAN) LUAS 84.000 M2
POKJA UPBU KUALA PEMBUANG
TERLAMPIR